
Spa Eclipse Installation & Operations Manual
1
TABLE OF CONTENTS
Installation Instructions
1. Mounting............................................................................................ 1
2. Plumbing - DEL Mixing System........................................................ 1
3. Plumbing - Ozone Generator............................................................ 1
4. Electrical............................................................................................. 2
5. Operation............................................................................................ 2
6. System Maintenance......................................................................... 2
Figure 1: Spa Eclipse Mounting & Connections................................. 3
Figure 2: DEL Optimized Mixing System............................................. 3
Warranty................................................................................................. 4
Installation Instructions
1. Mounting
a.TheSpaEclipsemustbemountedhorizontallywithozonetubing
connectionpointingdown.Usebothmountingflanges.
b.Mountashighaspossiblewithintheprotectedequipmentarea.
2. Plumbing - DEL Mixing System
a.Foroptimaldissolutionofozoneintothewater,installtheDEL
MixingSysteminthewatercirculationlineasgenerallyshownin
Figure2.
b.Forothercirculationsystemsorvacuumsources,DELIndustries
providesawiderangeofinstallationkits.ContactDELCustomer
Serviceforassistance.
3. Plumbing - Ozone Generator
a.Connectozonecompatibletubing(1/4”internaldiameter)tothe
openhosebarbontheSpaEclipse.
b.Runtubingtotheozoneinjectororappropriatevacuumsource.
i. Iftheozonegeneratorismountedabovethewaterline,tubing
mayberundirectlytothevacuumsource.
ii.Ifozonegeneratorismountedbelowthewaterline,runtubing
toapointabovethewaterlineandbackdowntothevacuum
source.
Comentarios a estos manuales