
www.delozone.com 1-800-676-1335
ECLIPSE Suction-side and
TOTAL ECLIPSE MDV Installation
(continued)
19
Ensure Injector is installed
in correct orientation. Flow
direction is marked with an
arrow on injector body.
NOTE:
120V
EC-4
3/16” Ozone
Tubing
Injector
Ball
Valve
Return to Pool
Typical Installation—Eclipse 1, 2, or 4 with MDV
MDV Installation—Existing Pool with Cleaning System (no spa)
MDV
Total Eclipse
120V
Union(s)
(recommended)
#5 Check Valve
(provided)
spaparts.com.au - Australian Spa
Parts
Comentarios a estos manuales