Del ozone Spa-Eclipse Manual de instalación Pagina 9

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 16
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 8
Eclipse Installation & Operations Manual
7
3D. System Shut-Down
The following sequence of steps must be followed for servicing or
for storage.
1. Disconnect the power to the ozone generator.
2. After the generator has been shut down, the pool water
circulation pump may be turned off.
3. If the system is to be shut down for an extended period,
disconnect the Ozone Tube from the unit.
3E. Water Chemistry
Regular chlorine or bromine testing should be performed as
normal. Ozone will be eliminating the majority of contaminants.
Therefore, only a small amount of chemicals will need to be added
- just enough to maintain a minimum of residual level of 0.5 - 1.0
ppm chlorine or 1.0 - 2.0 ppm bromine. Ozone is pH neutral thus
minimizing pH adjustments.
SECTION 4. Maintenance
4A. System Electromechanical Overview
Power Supply
Bracket
Power Supply
Mouting Screws
Fuse Holder
Grounding
Lugs
Ozone Outlet
Barb
Terminal Block
Ozone Module
Power Supply Connecter
Manifold
Figure 4: Eclipse Overview
Vista de pagina 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Comentarios a estos manuales

Sin comentarios